Fortune Global 500 consulting firm needed to migrate 1.3 million critical documents from 12 DISCO databases to the more advanced RelOne platform.

Challenge

  • Massive Data Volume: Efficiently transferring 1.3 million documents and corresponding work product.
  • Data Compatibility: Ensuring seamless compatibility between the DISCO and RelOne platforms to avoid data loss or corruption.
  • Downtime Minimisation: Maintaining continuous operation throughout the migration process to avoid impacting the firm’s workflow.

Solution

  • Creation of an exhaustive project plan incorporating a comprehensive migration checklist, activity tracking, a status system, and prioritised methodology
  • Migration checklist encompassing migration of all text, natives, metadata, productions, search terms reports, saved searches, and coding work product
  • Real-time status reporting
  • Extensive post-migration quality assurance to ensure all material was accurately transferred into RelOne

Impact

Small bubble image
Successful migration of 1.52 terabytes of data (comprised of 12 databases and 1.3 million documents) with perfectly preserved metadata
Small bubble image
Met customer’s rigorous quality assurance standards, as confirmed by customer’s litigation team sign-off after their final quality control checks
Small bubble image
Cost-savings through strategic selection of data to be migrated vs purged vs archived and additional savings through customised pricing models that ensured best pricing with lowest risk of unused GBs

Contact Us

Bubble