Challenge

  • Law firm followed a traditional data center model – with storage and computing through on-premise servers at a dedicated offsite location
  • Fixed nature required over-specification early in the cycle
  • Difficult to scale as per requirements
  • Required investments of ~$5 million every 4-5 years to replace or update aging infrastructure

Solution

  • Identified and advised migrating from physical infrastructure to cloud
  • Built team of four skilled resources to plan and execute
  • Migrated from physical infrastructure in three distinct phases to avoid disruption of services

Impact

Small bubble image
Created an OPEX-based cost model that can reduce over time (absolutely or per user) as existing infrastructure phased out and cloud optimised
Small bubble image
Increased ability to scale
Small bubble image
Improved ‘off-network’ (i.e., remote) access for users with higher availability/reduced downtime
Small bubble image
Reduced cost from approximately $1.2 Million to $800K annually resulting in $400K annual savings
Design Slide on Managed Business Solutions by Elevate